Back    Zoom +    Zoom -
CGN POWER (01816.HK): Taishan Unit 2 Undergoes Orderly Refueling Outage
Recommend
3
Positive
3
Negative
4
CGN POWER (01816.HK) announced that Taishan Nuclear Power, a non-wholly owned subsidiary of the company, owns Units 1 and 2 of the Taishan Nuclear Power Plant, which are the worlds first two EPR units to commence commercial operation. In accordance with the plants design requirements, Taishan Nuclear Power initiated the scheduled annual refueling outage for Unit 2 at the end of 2025 as planned. During the period, Taishan Nuclear Power has adjusted and added certain inspections and tests for Unit 2 to further accumulate data and experience for the units subsequent long-term stable operation. The relevant work is currently progressing in an orderly manner. (sl/w)

Auto-translated by AI
This article was automatically translated by AI, the original language version should be considered the authoritative version. AASTOCKS.com Limited does not guarantee its accuracy or completeness and accepts no liability for any damages or losses arising from the use of this translation. More Details


Related NewsJPM: Preferred Renewable Energy H Shrs GOLDWIND (02208.HK), GCL TECH (03800.HK) and CGN POWER (01816.HK)

AASTOCKS Financial News